'JERLAC Solventless Epoxy Grey'. Factory applied, grey coloured, two-component Epoxy coating. Mix Base:Curing Agent in a 2:1 volume ratio and apply as per manufacturer's TDS reference 'BN434', dated '24/07/2023', revision '00'. Cure for 7 days@30°C. For use with water up to 85°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Wanan brand WA F 501'. Factory applied, blue coloured epoxy powder coating. Apply as per 'Wanan Industry Group Co., Ltd.' TDS 'WATDS20200801a' dated 'Aug. 1, 2020'. Cure for 20 minutes@200°C. For use with water up to 85°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'E0-850-5210-001'. Factory applied, blue coloured epoxy powder coating. Apply as per 'Ziac Trattamenti Metallici SNC' instructions 'nr.01, rev.00, issue 01' dated 01/082016. Cure for 30 minutes@210°C. For use with water up to 85°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'MS 520B'. Factory applied, dark grey coloured enamel coating. Apply as per manufacturer's instructions 'ref. PRO PR 15 Gi 01 UK' dated April 04, 2024. Cure for 10 minutes@850°C. For use with water up to 85°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
‘Subcote FLP II’. Site applied, two-component, green coloured (once mixed and applied) Polyurethane coating. Mix parts A & B in a 100:72 weight ratio and apply & then flush as per manufacturer's IFU 'IFU_Subcote FLP II_In-Situ Pipes_Issue 7_210921 RS EN'. Cure for 1 hour@3°C. For use with water up to 60°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
‘Sikadur-Combiflex® SG System’ comprising of ‘Sikadur® 31 DW’ epoxy adhesive to be used in conjunction with ‘Sika Combiflex® SG Membrane’. ‘Sikadur® 31 DW’ is a site applied, grey coloured, two-part epoxy adhesive consisting of Part A (white coloured) and Part B (black coloured). Part A and Part B are mixed in a weight ratio of 3:1, applied and cured for 14 days@30°C. ‘Sika Combiflex® SG Membrane’ is a modified flexible Polyolefin (FPO) waterproofing tape to be applied over the adhesive and is approved as the water contact layer. Apply as per ‘Sikadur-Combiflex® SG System’ System Product Data Sheet, ‘Edition: 24/10/2012, Identification no: 02 07 03 02 System, Version: GCC’. For use with water up to 50°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Therma-Light Touch Up Paint'. Site applied, black coloured coating. Apply as per manufacturer's TDS 'TDS/CLP-L 44', dated '28/2/2024'. Cure for 7 days@22°C. For use with water up to 60°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
‘Sika Monotop 1010’ primer for use with ‘Sika Monotop 4012’ cement mortar. Site applied, grey coloured cementitious, polymer modified coating material used as bonding primer and cementitious, fibre reinforced, low shrinkage repair mortar. First coat: Mix 25kg ‘Sika Monotop 1010’ with 5.25 litres of water and apply as per manufacturer’s ‘Sika Monotop 4012' IFU issue no. ‘001’ dated ‘July 2022’. Second coat: Mix 25kg ‘Sika Monotop 4012’ with 3.8 litres of water and apply immediately to the first coat as per manufacturer’s IFU issue no. ‘001’ dated ‘July 2022’. Cure for 21 days@7°C. For use with water up to 23°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'DIMERSIL 20'. Blue coloured, compressed fibre gasket material, manufactured by calendaring. For use with water 85°C.
'CF 1100'. Blue coloured, compressed fibre gasket material, manufactured by calendaring. For use with water 85°C.
Page 754 of 1139
We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.