'Jotapipe AC - 1003 Blue & Green. Factory applied, green or blue coloured epoxy coatings (manufactured in Dammam, Saudi Arabia). Apply as per manufacturer's MTI '001 - 2024 - SA – EN'. Cure for 4 minutes@230°C. For use with water up to 85°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Electroline ES 424'. Factory applied, white coloured, two-component epoxy coating. Mix Part A and Part B in a volume ratio of 2:1 and apply as per manufacturer's TDS 'ECL/ TDS / ES424', version '0', dated '05.01.2024'. Cure for 7 days@30°C. For use with water up to 65°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mix and/or cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Eco Coat Epoxy Blue Patch Up Paint (PFC/1017)'. Factory applied, blue coloured, two-component epoxy coating. Mix in a 3:2 volume ratio and apply as per manufacturer's IFU 'DOC/PFC/PU/101', dated '01.04.2024'. Cure for 8 hours@30°C. For use with water up to 85°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
`MECH WEY-Black, WEY-Red & WEY-Blue`. Factory applied epoxy coatings. Apply and cure as per manufacturer's instructions '24136' dated 2025/1/26. For use with water up to 85°C.
'Carboguard AQP FC Part A and Part B'. Site applied, grey coloured (once applied) epoxy coating. Mix Parts A & B in a weight ratio of 1:1 and apply as per manufacturer's Product Data Sheet '8163', dated 'March 2025'. Cure Coat 1 for 24 hours at 20°C and Coat 2 for 7 days at 20°C. For use with water up to 23°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mix and/or cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'LEAKBLOK® P100'. Green coloured fibre/NBR gasket material manufactured by calandering. For use with water up to 23°C. For use only as a jointing/gasket material having been tested at reduced surface area to volume ratio.
'SPS GRP Pipe'. Multi-layered, beige coloured GRP pipe, made by Continuous Filament Winding. For use with water up to 60°C.
'SANIBIW WB60 & SANIBIW WB80'. Off-white coloured, transparent, extruded silicone rubber hoses. Shore hardness 60 & 80. Tested in-radius size between 0.5mm & 1.5mm. For use with water up to 85°C.
'EPDM W8528'. Black coloured, extruded EPDM hose. Shore hardness 80. Tested in-radius size 1.0mm. For use with water up to 85°C.
'SL7065/SL7015'. Extruded, triple layered hose comprising of a translucent, silicone inner layer, white coloured polyester middle layer and translucent, silicone outer layer. Shore hardness 70. Tested in-radius size of complete hose is 1.8mm. For use with water up to 65°C.
Page 980 of 1156
We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.