Range of blue epoxy coated ductile iron gate valves with an EPDM coated ductile iron wedge. Maximum working pressure 16.0 bar. Maximum operating temperature 85°C.
Range of inlet control groups with DZR brass bodies consisting of an in-line, adjustable pressure reducing valve (adjustable in the range of 1.0 bar to 6.0 bar, pre-set at 3.0 bar), a pressure relief valve (6.0 bar) and an approved single check valve cartridge, verified by test (suitable for backflow protection against Fluid Category 2). For use with copper pipe (manufactured to BS EN 1057). Maximum working pressure 16 Bar Maximum operating temperature 85°C
'Grilamid TR ICR 12 LS natural' (appears white, transparent), 'Grilamid TR ICR 12 LS yellow 6908' (yellow coloured) and 'Grilamid TR ICR 12 LS blue 4271' (blue coloured). Injection moulded PA MACM12/X materials. For use with water up to 85°C.
'Anchor Pro Plus'. Site applied, two-part (supplied with internal mixing nozzle so no manual mixing required), brown coloured chemical anchor resin. Apply as per manufacturer's instructions dated 2025 - 12 - 09. Cure for 4 days@5°C. For use with water up to 23°C. For use only as a resin anchor having been tested at a reduced surface area to volume ratio of 1,000mm² per 1 litre of water. This material is only approved for the mixing and curing conditions that appear on the approval. If the mix and cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'TIMCO VESF 300/VESF 410'. Site applied, two-part (supplied with internal mixing nozzle so no manual mixing required), brown coloured chemical anchor resin. Apply as per manufacturer's instructions dated 01.12.2025. Cure for 4 days@5°C. For use with water up to 23°C. For use only as a resin anchor having been tested at a reduced surface area to volume ratio of 1,000mm² per 1 litre of water. This material is only approved for the mixing and curing conditions that appear on the approval. If the mix and cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
Page 466 of 494
We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.