'Iupital F10-02 nat, Iupital F20-03 nat & Iupital FG2025 nat (white coloured). Iupital F10-02 E9000 black & Iupital F20-03 E9001 black (black coloured)'. Injection moulded acetal materials, (manufactured in Bangkok, Thailand). For use with water up to 85°C.
'Delrin® FG100P NC010'. White coloured, injection moulded acetal material. For use with water up to 23°C.
'HF380-F'. White coloured, injection moulded ABS material. For use with water up to 85°C.
'Birla SRPC - Electrocement'. Factory applied, grey coloured, cement mortar. Mix cement, sand & water in a mass ratio of 0.6:1.0:0.22. Cure for 24 hours@27°C. For use with water up to 60°C. This material is only approved for the mixing & curing conditions that appear on the approval. If the mix and/or cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Electrocement CEM1-SR3 - Dalmia SRPC'. Factory applied, grey coloured sulphate resisting Portland cement mortar. Mix cement, sand and water in a mass ratio of 0.6:1.0:0.22. Cure for 4 days at 26°C, and then at 32°C for a further 24 days OR 24 hours@27°C. For use with water up to 60°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Kubotaseal BM'. Factory applied, black coloured asphaltic bituminous coating. Apply as per manufacturer's PDS reference `11004T-1.4' dated Feb, 20, 2020. Cure 6 hours@20°C. For use with water up to 60°C. Materials listed in this section are not approved for use for contact with water that is required to be wholesome on large water retaining structures such as lining of pipes, cisterns or water storage tanks. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'SC3 Blue PTFE Coating'. Blue coloured, factory applied, PTFE coating intended to coat 'O' rings. Apply and cure as per manufacturer's instructions 'LDAP-007 issue 1' dated 11/02/2020. For use with water up to 85°C.
'Conpipe Portland Cement Mortar NEN-EN 197-1 CEM II / A-LL 32,5 R'. Factory applied, grey coloured cementitious mortar lining. Mix cement and sand in a 1:1.1 mass ratio. Add water to cement in a mass ratio of 0.3-0.4. Cure for 28 days@20°C. For use with water up to 60°C. This material is only approved for the mixing & curing conditions that appear on the approval. If the mix and/or cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Conpipe Portland Cement Mortar NEN-EN 197-1 CEM I 42,5 N'. Factory applied, grey coloured cementitious mortar lining. Mix cement and sand in a 1:1.1 mass ratio. Add water to cement in a mass ratio of 0.3-0.4. Cure for 28 days@20°C. For use with water up to 60°C. This material is only approved for the mixing & curing conditions that appear on the approval. If the mix and/or cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'JH C01'. Factory applied, blue coloured epoxy powder coating. Apply as per manufacturer's instructions 'V7.2' issued January 2018. Cure for 15 minutes@200°C. For use with water up to 85°C.
Page 13 of 1152
We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.