'Apcoflor MFP 140 Primer and Smartcare Polyurea PW Coating'. Factory applied, grey coloured (once mixed), two-component primer (non-water contact primer) and two-component coating (water contact coating). Mix Apcoflor MFP 140 Primer in a 1:1 mix ratio and apply as per Product Data Sheet ‘Version ‘0’, dated ‘Aug.2007’. Cure for 2 hours@25°C. Then mix and apply Smartcare Polyurea PW Coating as per Product Data Sheet ‘V01’, dated ‘8/2022’. Cure for 1 minute@25°C. For use with water up to 85°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mix and/or cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Rhenolub® MK I-RB FDA'. Factory applied, clear epoxy coating. Apply as per manufacturer's instructions 'version 1' dated 28.10.2022. Cure for 30 minutes@140°C. For use with water up to 85°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'EBONITA AL'. Factory applied, blue coloured hard rubber coating. Apply adhesives and coating in accordance with manufacturer's Technical Data Sheet dated 1st September 2022. Cure for 8 hours@140°C. For use with water up to 23°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
‘R-4401, E-44131, E-4413, E-4414, E-4420, E440001, E441001, E440002, E441002, E-5402, E-5403, E-5404, E540001. E541001, E540002, E540003, E541003 & E440007’. Factory applied, grey-blue coloured enamel coatings. Apply as per manufacturer’s instructions ‘issue 02/2016’ dated 05.10.2016. Cure for 6 minutes@840°C. For use with water up to 85°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
`KA Tanking Slurry`. Site applied, grey coloured tanking slurry. Mix tanking slurry with water in a 3:1 volume ratio and apply coat 1 as per manufacturer's IFU 'AFSOL001', dated '05/04/2022'. Cure for 24 hours@7°C. Mix tanking slurry with water in a 3:1 volume ratio and apply coat 2, 24 hours after the first coat, as per manufacturer's IFU 'AFSOL001', dated '05/04/2022'. Cure for 14 days@7°C. For use with water up to 23°C. This material is only approved for the mixing & curing conditions that appear on the approval. If the mix and/or cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
Page 97 of 232
We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.