‘Endoprene® 85-20’. Factory applied, two component, beige coloured, solvent free polyurethane coating. Mix and apply as per Technical Data Sheet dated '09/09/2019'. Cure for 8 days@20°C. For use with water up to 23°C. This material is only approved for the curing conditions that appear on the approval. If the curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'ZX-9 Zhenxin Epoxy Powder Coating Blue & Red'. Factory applied, blue or red coloured epoxy coatings. ‘ZX-9 Zhenxin Epoxy Powder Coating Green’ was added to the approval in November 2025. Green coloured epoxy coatings. Apply as per manufacturer's TDS 'ZX-9-HY/NG' dated '2023-06-02'. Cure for 10 minutes@200°C. For use with water up to 85°C. This material is only approved for the curing conditions that appear on the approval. If the curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'PM6/35/7623 Vitreous Enamel Coating. Factory applied, blue coloured enamel coating. Apply and fire as per manufacturer's datasheet dated '01-2018' For use with water up to 85°C.
‘Corroless ACO Brush Grades RAL5005 (GB861) and Light Green (GB206)’ (formerly known as 'Acothane Brush Grades Blue & Green'). Site applied, blue or green coloured, two-part polyurethane coatings consisting of an amber coloured, liquid activator and blue or green coloured coating. Mix brush grade and activator in a 3.24:1 weight ratio. Apply as per technical data sheet dated Feb 2020. Cure for 14 days@7°C. For use with water up to 23°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mix and cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Interline 975 White'. Site applied, two-part epoxy coating which can be applied as one coat or three coats. Mix parts A & B in a 2.2:1 and apply as per manufacturer's TDS 'Ref:4236', 'Issue Date: 04/02/2015'. When applied as a single coat, the coating must be cured for 14 days at 10°C. When applied as a three-coat system, the coating must be cured as follows: coat 1 = 24 hours@10 °C, coat 2 = 24 hours@10 °C & coat 3 = 14 days@10 °C. For use with water up to 23°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
Page 1278 of 2364
We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.