'Interline 975 White'. Site applied, two-part epoxy coating which can be applied as one coat or three coats. Mix parts A & B in a 2.2:1 and apply as per manufacturer's TDS 'Ref:4236', 'Issue Date: 04/02/2015'. When applied as a single coat, the coating must be cured for 14 days at 10°C. When applied as a three-coat system, the coating must be cured as follows: coat 1 = 24 hours@10 °C, coat 2 = 24 hours@10 °C & coat 3 = 14 days@10 °C. For use with water up to 23°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
‘Sika MonoTop®-1010’, one-part cementitious bonding primer for use with ‘Sika MonoTop®-615’ one-part cementitious repair mortar. Mix ‘Sika MonoTop®-1010’ with tap water in the ratio of 25kg:5.25 litres. Apply as per manufacturer’s Product Data Sheet ‘020302020010000054, March 2021, Version 01.01’. Mix ‘Sika MonoTop®-615’ with tap water in the ratio of 25kg:3.8 litres and apply immediately to ‘Sika MonoTop®-1010’ as per manufacturer’s Product Data Sheet ‘020302040030000198, December 2021, Version 02.02’. Cure for 21 days@7°C. For use with water up to 23°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'LUBKOTE® E352, LUBKOTE® SG96(N96), LUBKOTE® SG98(N98)'. White coloured lubricants. Apply as per manufacturer's product data sheet 'YC20231201-1'. For use with water up to 85°C.
'ForTii Ace WX53-FC NA99001' (natural, appears beige in colour) & 'ForTii Ace WX53-FC BK00001' (black coloured). Injection moulded polyamide materials. For use with water up to 85°C.
'Acudel 22000 NT 15’ (natural - appears off-white coloured) & ‘Acudel 22000 BK 937’ (black coloured). ‘Acudel 22000 BK 937 ECHO RP’ (black coloured) was added to the approval in April 2025. Injection moulded PPSU materials. For use with water up to 85°C.
Page 604 of 820
We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.