'Promag'. Factory applied, black coloured (once mixed), polyurethane primer and topcoat manufactured in Suzhou, China. Mix components A & B of the primer in a 1:2 mass ratio and apply as per manufacturer's instructions dated '13-01-2022' Cure for 2 hours@23°C. Mix components A, B & C of the topcoat in a 92.59%:5.19%:2.22% volume ratio and apply as per manufacturer's instructions dated '13-01-2022'. Cure for 20 seconds@23°C. For use with water up to 23°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'V- SRPC Portland Cement'. Factory applied, grey coloured Portland Cement. Mixx Sand:water:cement in a weight ratio of 0.6:1.0:0.22. Cure for 96 hours@26°C and then 576 hours@32°C. For use with water up to 65°C.
‘Fybar PT 60' (light green on one side and beige on the other). Fibre/NBR gasket material manufactured by calendaring. For use with water up to 85°C. For use only as a jointing/gasket material having been tested at a reduced surface area to volume ratio.
'SF4300'. Nitrile rubber/aramid fibre, calendered material which is white coloured on one side and green coloured on the other side. For use with water up to 23°C.
'Aropol M 105 TA WRAS’ (formerly known as ‘Aropol M 105 TA’) & ‘Enguard GE NTRL HH WRAS’ (formerly known as ‘Enguard GE NTRL HH'): Translucent straw coloured (glossy one side textured the other), polyester laminating resin manufactured by hand lay-up & gelcoat (brush applied), sheet material. ‘Aropol M 105 TAXR’ & ‘Enguard GE WHI S WRAS’ (formerly known as ‘Enguard GE WHI S’): White coloured (glossy) on one side, translucent straw coloured (textured on the other), polyester laminating resin manufactured by hand lay-up & gelcoat (spray applied), sheet material. Apply as per Ineos Composites method statement ‘Preparation of laminated products for freshwater applications (WRAS)’, ‘code R071, edition 2’ dated 19.1.22. Cure for 9 hours at 23°C with 2% of MEKP-50 catalyst, post-cure for 24 hours@50°C and wash part thoroughly in water before use. For use with water up to 23°C. These materials are only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
Page 457 of 2310
We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.