'TEPCON® M90 NAT CF2001 & TEPCON® M270 NAT CF2001'. Natural (appears white in colour), injection moulded acetal materials. For use with hot and cold water up to 85°C.
`9011 modified bitumen anticorrosive coating`. Factory applied, black coloured bituminous coating. Apply and cure as per manufacturers `IFU Version no. 03' dated June 18 2020. For use with water up to 23°C.
'Electrocoat BP 116'. Factory applied, black coloured bitumen paint. Apply as per manufacturer's technical data sheet, document number 'ECL/TDS/BP116' dated 10th January 2016. Cure for 30 minutes@55°C and then 10 hours@23°C. For use with water up to 60°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'WB-108'. Factory applied, two-component, grey coloured epoxy coating. Mix, apply and full cure (7 days@20°C) as per manufacturer's technical data sheet 'file no. TWJ-WB-108', 'edition: A1' dated 01/12/2020. For use with water up to 65°C.
'Epoxy phenolic FBE-4 RAL 5010'. Factory applied, blue coloured epoxy phenolic coating. Apply as per manufacturer's instructions dated '11/20'. Cure for 10 minutes@200°C. For use with water up to 85°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
Page 399 of 2219
We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.