'Chromapoxy H.B.F.N.Paint Blue'. Factory applied, blue coloured, two-part epoxy coating. Mix base and accelerator in a 3:1 volume ratio and apply as per manufacturer's data sheet 'NCE/200', issue date '15.01.2014'. Cure for 7 days@32°C. For use with water up to 65°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mix and/or cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Chromapoxy H.B.F.N.Paint Blue'. Factory applied, blue coloured, two-part epoxy coating. Mix base and accelerator in a 3:1 volume ratio and apply as per Nav Durga Chromatics Private Limited data sheet 'NCE/200', issue date '15.01.2014'. Cure for 7 days@32°C. For use with water up to 65°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mix and/or cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'L-01 GP Blue-grey Enamel'. Factory applied, blue-grey coloured Enamel coating. Apply as per manufacturer's TDS 'Version: 01', dated '2025-01-02'. Cure for 15 minutes@200°C and then fire for 10 minutes@850°C. For use with water up to 85°C. This material is only approved for the curing/firing conditions that appear on the approval. If the cure/fire conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Ever-Blue'. Factory applied, blue coloured epoxy powder coating. Spray apply coating when substrate is at a temperature of between 180°C & 190°C as per manufacturer's TDS '20200801 A2', dated '09-10-2025'. Cure for 10 minutes@200°C. For use with water up to 85°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'JSP/SF-Blue'. Factory applied, blue coloured epoxy powder coating. Spray apply coating when substrate is at a temperature of between 180°C & 190°C as per manufacturer's TDS '20200801 A2', dated '09-10-2025'. Cure for 10 minutes@200°C. For use with water up to 85°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
Page 182 of 201
We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.