'PMSP5112-M, PMSP5113-M, PMSP5114-M, PMSP5115-M, EP5112D01SC, EP5113D01SC, EP5114D01SC & EP5115D01SC'. Factory applied, blue coloured, Porcelain Vitreous Enamel coatings. Apply as per manufacturer's User Manual 'PEM 37', 'Edition 01', dated '14/10/2020'. Cure for 5 minutes@840°C. For use with water up to 85°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'NMSP2251M, NMSP2265M, NMSP2266-M, NMSP2267-M, ER2251A01SM, ER2265A01SM, ER2266A01SC, ER2267A01SC'. Factory applied, blue coloured, Porcelain Vitreous Enamel coatings. Apply as per manufacturer's User Manual 'PEM 38', 'Edition 01', dated '14/10/2020'. Cure for 5 minutes@840°C. For use with water up to 85°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'L-01 GP Blue-grey Enamel'. Factory applied, blue-grey coloured Enamel coating. Apply as per manufacturer's TDS 'Version: 01', dated '2025-01-02'. Cure for 15 minutes@200°C and then fire for 10 minutes@850°C. For use with water up to 85°C. This material is only approved for the curing/firing conditions that appear on the approval. If the cure/fire conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Epilux 610 T Primer for use with Epilux 155 SF Topcoat'. Factory applied, white coloured (once applied) two-part epoxy coating. The topcoat can also be used alone, without the primer. 'Epilux 610 T Primer’ comprises of a base & hardener to be mixed in a 3:1 volume ratio and then applied as per manufacturer's TDS 'Ver.3 Aug 25'. Cure for 16 hours@25°C – 28°C, 60%±10% RH. 'Epilux 155 SF Topcoat' comprises of a base & hardener to be mixed in a 4:1 volume ratio and then applied as manufacturer's TDS 'Ver2 Aug 25'. Cure for 7 days@25°C – 28°C, 60%±10% RH. For use with water up to 60°C. This material is only approved for the RH, mixing & curing conditions that appear on the approval. If the RH, mix and/or cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'Belzona 1331'. Grey coloured, site applied, two-component epoxy coating. First coat: Mix Belzona 1331 (white, opaque paste) parts A & B in a weight ratio of 2.2:1 and apply as per manufacturer’s IFU ’06-03-19’. Cure for 6-8 hours@10°C or 3-4 hours@30°C then apply: Second coat: Mix Belzona 1331 (grey, opaque paste) parts A & B in a weight ratio of 2.2:1 and apply as per manufacturer’s IFU ’06-03-19’. Cure in accordance with manufacturer’s IFU ’06-03-19’, ‘Completion of the Molecular Reaction’ table, ‘Full mechanical/thermal loading or water immersion’. For use with water up to 23°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mix and/or cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
Page 1556 of 1565
We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.