Filling link assembly with a nylon body and EPDM ‘O’-rings. The product incorporates a screwdriver operated shut off valve and two check valve cartridges, verified by test (suitable for backflow protection against Fluid Category 3). The product is also supplied with two screwdriver operated angled spherical valves and a mounting bracket. Maximum working pressure 10.0 bar. Cold water use only.
Range of wall mounted, gas-fired, condensing combination boilers providing domestic hot water via a plate heat exchanger. The pressurised central heating system incorporates an expansion vessel and a pressure relief valve set at 3.0 bar. The inlets to the domestic hot water and primary circuits each have a screwdriver operated angled spherical valve. Both include a ½” BSP (M) connection for a filling link. The Greenstar CDi models only are supplied with an integral charging link (CAB device) verified by test (suitable for backflow protection against Fluid Category 3). Maximum working pressure of the primary circuit is 2.5 bar. Maximum working pressure of the secondary circuit is 10.0 bar. Maximum operating temperature of primary circuit is 82°C. Maximum operating temperature of secondary circuit is 60°C.
Preheat accessory assembly for connection to the domestic hot water circuit of a combination boiler. Incorporates flow sensor, flow restrictor, flow silencers, pre-heat sensor and filter. Maximum working pressure 10.0 bar. Maximum operating temperature 85°C.
Range of wall mounted, gas-fired condensing combination boilers providing domestic hot water via a plate heat exchanger and pressurised central heating system incorporating an expansion vessel, pressure relief valve set at 3.0 bar and flow regulators. The inlets to both domestic hot water and primary circuits are controlled via screwdriver operated angled spherical valve. The primary circuit can be filled via a built in CAB device, that has been verified by test (suitable for backflow protection against Fluid Category 3). Primary circuit: Maximum working pressure 2.5 bar. Maximum operating temperature 80°C. Secondary circuit: Maximum working pressure 10.0 bar. Maximum operating temperature 60°C.
Description Greenstart 4000 Combi DHW Pre-heat kit, Preheat accessory assembly for connection to the domestic hot water circuit of a combination boiler max working pressure 10 bar max operating temperature 82℃
Page 2 of 3
We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.