Ideal Boilers Ltd Approvals


#2204326

‘POD’ range of indirect and direct heat interface units providing space heating and instantaneous hot water. The heat transfer is generated via plate heat exchangers. The domestic hot water (DHW) circuit incorporates an adjustable temperature mixing valve. The indirect models incorporate an expansion vessel (on the CW inlet of the DHW circuit) and a pressure relief valve set at 3.0 bar (on the space heating circuit). The indirect models only are supplied with a temporary filling loop, which comprises of a stainless steel braided EPDM lined flexible hose assembly and a lever operated spherical valve for connection to the primary circuit. The angled cold water inlet incorporates an isolation valve and a branch to connect to the filling loop, which includes a double check valve assembly (verified by test, suitable for backflow protection against Fluid Category 3). Maximum working pressure for indirect units: Primary circuit: 16.0 bar. Space heating: 2.5 bar. Secondary circuit (DHW): 10.0 bar. Maximum working pressure for direct units: Primary circuit: 10.0 bar. Space heating: 10.0 bar. Secondary circuit (DHW): 10.0 bar. Maximum operating temperature for domestic hot water 65°C. Maximum operating temperature for central heating and primary circuit 85°C.

Section:
1350 Heat Exchangers
Size:
22mm copper pipe connection.
Marking:
Ideal Heating badge and model on adhesive label on front casing. Manufacturer, serial number, model number, pressure rating and other technical information on data label within appliance.
Installation Requirements:
R001 R140 R360
Expiry date:
30/04/2027
Model:
POD range of indirect (i prefix) and direct (d prefix) HIU: i305, i405, i505, i605, i705, d30, d40, d50, d60. All models can have the following suffixes to denote the inclusion of a heat meter: HWM for a hard wired MBUS and WLM for a wireless MBUS.
Product Images

Approval Holder:
Ideal Boilers Ltd
Company Name
Ideal Boilers Ltd
Address
PO Box 103 National Avenue Hull East Yorkshire
Postcode
HU5 4JN
Phone
07775659359
General Email
ben.higinbotham@groupe-atlantic.co.uk

View All Listings by this Company
Manufacturer:
Ideal Boilers Ltd
Company Name
Ideal Boilers Ltd
Address
PO Box 103 National Avenue Hull East Yorkshire
Postcode
HU5 4JN
Phone
07775659359
General Email
ben.higinbotham@groupe-atlantic.co.uk

View All Listings by this Company

Print This Approval


#2207350

Range of wall hung, gas fired, combination boilers providing domestic hot water via a plate heat exchanger. The primary circuit incorporates an integral expansion vessel and a pressure relief valve set at 3.0 bar. The product is supplied with a rigid pipe filling loop, followed by a separate isolation valve. The filling loop pipe attaches to the cold water inlet valve which incorporates a double check valve assembly (verified by test, suitable for backflow protection against Fluid Category 3) on the branch to the filling loop. The primary circuit includes an isolation valve on the flow and return and is also supplied with two loose 22mm compression isolation valves and a filter. Maximum working pressure of the primary circuit is 2.5 bar and the maximum supply pressure to the secondary circuit is 10.0 bar. Max operating temperature 65°C.

Section:
1465 Heaters
Section Subtitle:
Combination boilers and Water Jacketed Tube heaters. Low volume water content. Heat retained in water heaters will cause expansion of water after closure of draw-off taps and valves. Provision for expansion of water must be made to accommodate excess pressure within the system. Particular care is required where check valves are positioned, or loose jumper valves are thought to be upstream of the heater.
WRAS Approval Number:
2207350
Size:
Secondary: 15mm compression. Primary: 22mm compression.
Marking:
Ideal heating printed on front casing. Model and size printed on drop down door.
Installation Requirements:
R001 R140 R360
Expiry date:
31/07/2027
Proviso:
Supplied with a temporary filling loop. The filling loop must be installed with the appropriate backflow prevention device in accordance with clause G24.2, Guidance to the Water Supply (Water Fittings) Regulations 1999.
Model:
Logic Max Combi² C24 – UIN 228334, Logic Max Combi² C30 – UIN 228335, Logic Max Combi² C35 – UIN 228336, Logic + Combi² C24 – UIN 228329, Logic + Combi² C30 – UIN 228330, Logic + Combi² C35 – UIN 228331, Logic Combi² C24 – UIN 228307, Logic Combi² C30 – UIN 228308, Logic Combi² C35 – UIN 228309.

Approval Holder:
Ideal Boilers Ltd
Company Name
Ideal Boilers Ltd
Address
PO Box 103 National Avenue Hull East Yorkshire
Postcode
HU5 4JN
Phone
07775659359
General Email
ben.higinbotham@groupe-atlantic.co.uk

View All Listings by this Company
Manufacturer:
Ideal Boilers Ltd
Company Name
Ideal Boilers Ltd
Address
PO Box 103 National Avenue Hull East Yorkshire
Postcode
HU5 4JN
Phone
07775659359
General Email
ben.higinbotham@groupe-atlantic.co.uk

View All Listings by this Company

Print This Approval


#2207374

Range of wall hung, gas fired, combination boilers providing domestic hot water via a plate heat exchanger. The primary circuit incorporates an integral expansion vessel and a pressure relief valve set at 3.0 bar. The product is supplied with a rigid pipe filling loop, followed by a separate isolation valve. The filling loop pipe attaches to the cold water inlet valve which incorporates a double check valve assembly (verified by test, suitable for backflow protection against Fluid Category 3) on the branch to the filling loop. The primary circuit includes an isolation valve on the flow and return and is also supplied with two loose 22mm compression isolation valves and a filter. Maximum working pressure of the primary circuit is 2.5 bar and the maximum supply pressure to the secondary circuit is 10.0 bar. Max operating temperature 65°C.

Section:
1465 Heaters
Section Subtitle:
Combination boilers and Water Jacketed Tube heaters. Low volume water content. Heat retained in water heaters will cause expansion of water after closure of draw-off taps and valves. Provision for expansion of water must be made to accommodate excess pressure within the system. Particular care is required where check valves are positioned, or loose jumper valves are thought to be upstream of the heater.
WRAS Approval Number:
2207374
Size:
Secondary: 15mm compression. Primary: 22mm compression.
Marking:
Ideal heating printed on front casing. Model and size printed on drop down door.
Installation Requirements:
R001 R140 R360
Expiry date:
31/07/2027
Proviso:
Supplied with a temporary filling loop. The filling loop must be installed with the appropriate backflow prevention device in accordance with clause G24.2, Guidance to the Water Supply (Water Fittings) Regulations 1999.
Model:
INDEPENDENT COMBI² C24 INDEPENDENT COMBI² C30 INDEPENDENT COMBI² C35

Approval Holder:
Ideal Boilers Ltd
Company Name
Ideal Boilers Ltd
Address
PO Box 103 National Avenue Hull East Yorkshire
Postcode
HU5 4JN
Phone
07775659359
General Email
ben.higinbotham@groupe-atlantic.co.uk

View All Listings by this Company

Print This Approval


#2207375

Range of wall hung, gas fired, combination boilers providing domestic hot water via a plate heat exchanger. The primary circuit incorporates an integral expansion vessel and a pressure relief valve set at 3.0 bar. The product is supplied with a rigid pipe filling loop, followed by a separate isolation valve. The filling loop pipe attaches to the cold water inlet valve which incorporates a double check valve assembly (verified by test, suitable for backflow protection against Fluid Category 3) on the branch to the filling loop. The primary circuit includes an isolation valve on the flow and return and is also supplied with two loose 22mm compression isolation valves and a filter. Maximum working pressure of the primary circuit is 2.5 bar and the maximum supply pressure to the secondary circuit is 10.0 bar. Max operating temperature 65°C.

Section:
1465 Heaters
Section Subtitle:
Combination boilers and Water Jacketed Tube heaters. Low volume water content. Heat retained in water heaters will cause expansion of water after closure of draw-off taps and valves. Provision for expansion of water must be made to accommodate excess pressure within the system. Particular care is required where check valves are positioned, or loose jumper valves are thought to be upstream of the heater.
WRAS Approval Number:
2207375
Size:
Secondary: 15mm compression. Primary: 22mm compression.
Marking:
I-MINI² printed on front casing. Model and size printed on drop down door.
Installation Requirements:
R001 R140 R360
Expiry date:
31/07/2027
Proviso:
Supplied with a temporary filling loop. The filling loop must be installed with the appropriate backflow prevention device in accordance with clause G24.2, Guidance to the Water Supply (Water Fittings) Regulations 1999.
Model:
I-MINI²C24 I-MINI²C30 I-MINI²C35

Approval Holder:
Ideal Boilers Ltd
Company Name
Ideal Boilers Ltd
Address
PO Box 103 National Avenue Hull East Yorkshire
Postcode
HU5 4JN
Phone
07775659359
General Email
ben.higinbotham@groupe-atlantic.co.uk

View All Listings by this Company

Print This Approval


#2207373

Range of wall hung, gas fired, combination boilers providing domestic hot water via a plate heat exchanger. The primary circuit incorporates an integral expansion vessel and a pressure relief valve set at 3.0 bar. The product is supplied with a rigid pipe filling loop, followed by a separate isolation valve. The filling loop pipe attaches to the cold water inlet valve which incorporates a double check valve assembly (verified by test, suitable for backflow protection against Fluid Category 3) on the branch to the filling loop. The primary circuit includes an isolation valve on the flow and return and is also supplied with two loose 22mm compression isolation valves and a filter. Maximum working pressure of the primary circuit is 2.5 bar and the maximum supply pressure to the secondary circuit is 10.0 bar. Max operating temperature 65°C.

Section:
1465 Heaters
Section Subtitle:
Combination boilers and Water Jacketed Tube heaters. Low volume water content. Heat retained in water heaters will cause expansion of water after closure of draw-off taps and valves. Provision for expansion of water must be made to accommodate excess pressure within the system. Particular care is required where check valves are positioned, or loose jumper valves are thought to be upstream of the heater.
WRAS Approval Number:
2207373
Size:
Secondary: 15mm compression. Primary: 22mm compression.
Marking:
KESTON printed on front casing. Model and size printed on drop down door.
Installation Requirements:
R001 R140 R360
Expiry date:
31/07/2027
Proviso:
Supplied with a temporary filling loop. The filling loop must be installed with the appropriate backflow prevention device in accordance with clause G24.2, Guidance to the Water Supply (Water Fittings) Regulations 1999.
Model:
KESTON COMBI² C30 & KESTON COMBI² C35 COMBINATION BOILERS

Approval Holder:
Ideal Boilers Ltd
Company Name
Ideal Boilers Ltd
Address
PO Box 103 National Avenue Hull East Yorkshire
Postcode
HU5 4JN
Phone
07775659359
General Email
ben.higinbotham@groupe-atlantic.co.uk

View All Listings by this Company

Print This Approval



Back To Directory Sections

Page 1 of 2

We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.