Section Code 5030 : Factory applied pipe & fittings coatings.
Back To Directory Sections'M-AC010'. Factory applied, blue coloured epoxy powder coating. Apply as per manufacturer's user manual 'rev. 2.0R' dated 10/10/2024. Cure for 20 minutes at 180°C. For use with water up to 85°C. This material is only approved for the curing conditions that appear on the approval. If the cure conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'ZX-9 Fusion Bonded Epoxy Powder Coating Blue & Red'. Factory applied, blue or red coloured epoxy coatings. Apply as per manufacturer's TDS 'ZX-9-HX' dated '2025.4.25'. Cure for 10 minutes@200°C. For use with water up to 85°C. This material is only approved for the curing conditions that appear on the approval. If the curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
'EB-1003'. Factory applied, blue coloured epoxy powder coating. Apply and cure as per manufacturer's instructions 'Fowry Powder-001' dated '2020.3.20'. For use with water up to 85°C.
'Powercron® 6070 B coating'. Factory applied, black coloured resin based coating. Apply as per manufacturer's TDS 'CR607B/CP588B'. Cure for 30 minutes@180°C. For use with water up to 23°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the materials are not covered by the scope of the approval.
‘Rashmi Ordinary Portland Cement’. Factory applied, grey coloured cement. Mix cement, sand & water in a mass ratio of 1:1.7:0.5 and apply as per manufacturer's instructions 'TSL/TSMD/DI/QA/TPI/DC/002', dated '09/06/2025'. Cure for 4 hours@45°C then cure in open air for 28 days@33-39°C. For use with water up to 60°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and or curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
Page 98 of 105
We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.