'DUAYEN E-39'. Factory applied, two-component, red coloured (once mixed) epoxy coating. Mix Parts A&B in a volume ratio of 79.5:20.5 and apply as per manufacturer's instructions '00.05102021'. Cure for 7 days@23°C. For use with water up to 23°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the materials are not covered by the scope of the approval.
'DUAYEN ANTIBLAST GEÇIRIMSIZ SPREY BOYA KAPLAMA'. Factory applied, two-component, black coloured (once mixed and applied), Polyurea coating. Mix parts A & B in a 1:1 volume ratio and apply as per manufacturer's TDS 'Rev01', date of issue '22.04.2024'. Cure for 14 days@25°C. For use with water up to 23°C. This material is only approved for the mixing and curing conditions that appear on the approval. If the mixing and/or curing conditions are varied from those specified on the approval then the material is not covered by the scope of the approval.
Page of 1
We use cookies to give you the best possible experience with WRAS. Some are essential to provide website functions and ensure the website is secure. We also use cookies to help us understand how people use the site and to make improvements. Click "Accept All" to enable recommended settings or click "Manage cookies" to adjust your settings. For more details, see our Cookie Policy.